Aeternus-TGS Contract
After finding a large deposit of oil and iridium within its eastern borderlands, the Theian Germanic State enacted a period of largescale expansion into the region all the way up to the Savalon River. Aeternus was contracted to provide oil refineries and extraction equipment, which were funded by allowing Aeternus Mining to set up extraction sites in the country and accepting Aeternus' infrastructure support packages focused on import/export logistics. An Aeternus contractor known as 'Olymp Constructa' began setting up the mining camps and orbitally-dropped equipment, with roughly one drop-pod arriving every 5 hours until 3 camps were completed. Thanks to the rising job opportunities, many workers and business owners from across Theia began to migrate to Krabhafen and Herbergsdorf which became a major infrastructure hub for the Keirian Desert.